|
Who's Online
There currently are 5699 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
I really like this manual and it's reliable.I found and bought easly.thank you.
;
Thank you very much. the Instruction corresponds to my expectations. Sent it in time. I don't regret that paid money.
;
Good quality. Quick service. I recommend to everyone.
;
Very good quality scan of the document. I am very pleased with what I got.
;
PDF Contains
Technical Data, Mechanical data, Detailed Circuit diagram with components value, PCB layout. Actual PCBs Print. Component List, Spare parts code list and Input output detail. It cover LBB1211, LBB1212, LBB1213, LBB1216, LBB1217.
It is the actual Service Manual for SQ10
WARNING: BEFORE SERVICING THIS CHASSIS, READ THE �X-RAY RADIATION PRECAUTION�, �SAFETY PRECAUTION� AND �PRODUCT SAFETY NOTICE� ON PAGE 3 OF THIS MANUAL.
SET-UP ADJUSTMENT
s The following adjustments should be made when a complete realignment is required or a new picture tube is installed. Perform the adjustments in order as follows : 1. Color Purity 2. Convergence 3. White Balance Note: The PURITY/CONVERGENCE MAGNET assembly and rubber wedges need mechanical positioning. Refer to figure 1. Mounting position of the purity magnet assembly should fit to same position as old one because slightly difference to the position depend on a kind of tube.
*
There are no adjustment of purity and convergence in some picture tube (Unified with purity magnet)
SPECIFIC INFORMATIONS GENERAL ADJUSTMENTS
COLOR PURITY ADJUSTMENT NOTE : Before attempting any purity adjustments, the receiver should be operated for at least fifteen minutes. 1. Demagnetize the picture tube and cabinet using a degaussing coil. 2. Set the brightness and contrast to maximum. 3. Use a green raster from among the built-in test signals. 4. Loosen the clamp screw holding the yoke and slide the yoke backward or forward to provide vertical green belt (zone) in the picture screen.
5. Remove the Rubber Wedges. 6. Rotate and spread the tabs of the purity magnet (See figure 2.) around the neck of the picture tube until the green belt is in the center of the screen. At the same time, enter the raster vertically. 7. Slowly move the yoke forward or backward until a uniform green screen is obtained. Tighten the clamp screw of the yoke temporarily. 8. Check the purity of the red and blue raster.
DEFLECTION YOKE
TEMPORARY MOUNTING
29.1mm(28", 29") 25mm(25") 19mm(19", 20", 21") 14mm(13", 14")
RUBBER WEDGE
ADHESIVE PURITY/ CONVERGENCE MAGNET ASS'Y
DEFLECTION YOKE
GLASS CLOTH TAPES
Figure 1.
�4�
|
|
|
> |
|