|
Who's Online
There currently are 5912 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
El producto satisface las necesidades del servicio t
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
ALIGNMENT PROCEDURES OF MECHANISM
[ 14PV120/07, 14PV125/ ( 01, 07, 39, 58 ), 14PV225/ ( 01, 07, 39, 58 ), 14PV422/ ( 01, 07, 39, 58 ), 14PV425/07 ]
The following procedures describe how to align the individual gears and levers that make up the tape loading/unloading mechanism. Since information about the state of the mechanism is provided to the System Control Circuit only through the Mode Switch, it is essential that the correct relationship between individual gears and levers be maintained. All alignments are to be performed with the mechanism in Eject mode, in the sequence given. Each procedure assumes that all previous procedures have been completed. IMPORTANT: If any one of these alignments is not performed properly, even if off by only one tooth, the unit will unload or stop and it may result in damage to the mechanical or electrical parts.
Alignment 1 Loading Arm (SP) and (TU) Assembly
Install Loading Arm (SP) and (TU) Assembly so that their triangle marks point to each other as shown in Fig. AL2.
Alignment 2 Mode Gear
Keeping the two triangles pointing at each other, install the Loading Arm (TU) Assembly so that the last tooth of the gear meets the most inside teeth of the Mode Gear. See Fig. AL2.
Triangle Marks Alignment 1 Loading Arm (SP) Assembly Last Tooth Alignment 2
Alignment points in Eject Position
Loading Arm (TU) Assembly
Top View
Most inside teeth of Mode Gear Mode Gear Alignment 3
Fig. AL2
Alignment 3 Cam Gear (A), Rack Assembly
Install the Rack Assembly so that the first tooth on the gear of the Rack Assembly meets the first groove on the Cam Gear (A) as shown in Fig. AL3.
Top View Cam Gear (A)(HI) Alignment 3
Bottom View
Alignment 1 First tooth
Alignment 2
Fig. AL1
First groove Gear on Rack Assembly on the Cam Gear (A)(HI)
Fig. AL3 2-4-17 T6410APM
|
|
|
> |
|