|
Who's Online
There currently are 5826 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
The service was quick and simple, finding the service manual easy and it appears to be the original with colour schematics. It contained the info I was after and so sorted the problem.
I have copied it to CD and attached the envelope to the inside back cover of the owners manual. Good manual and excelent service. Robin Wood, Wood Electronics, New Zealand.
;
Exactly what was needed to assess the product - excellent value and great service
;
Nice to have the service manual for the Sony DCR-TRV345E now. The document is of excellent quality.
;
MACKIE HR824 26 pages English-only Service Manual contains:
1) HR824 technical overview with the description of front and rear panel switches.
2) HR824 specs
3) Block Diagram
4) Wiring Diagram
5) Packaging management
6) Spare part & final assembly list (for PCB rev A and B) + exploded view
7) Test Procedures (where, how to measure voltage...) including Test Point diagram on the PCB.
8) IC and Transistor charts.
Excellent guide: very clear, good scan quality enabling us to print readable diagram :-)
Note:
Mackie HR824 make extensive use of surface mount devices (SMD). Service on the HR824 must
only be undertaken by experienced service technicians with the right tools, experience and patience to perform surface mount rework when needed.
;
This Service manual is very well scanned and its clean to read, no any anti-theft words that un-english could understand. I got my CCD600 working with this manual and it´s clear shematics :)
CX-954
2. The right and left load levers move toward the front part of the mechanical module, to release the locking of the load cam, at the front and rear ends of the levers, with the four shafts of the CRG chassis unit and the shaft of the clamp arm. The right front section of the load cam turns the clamp switch ON, completing the clamp operation.
A shaft (CRG) locked with the cam A shaft (clamp arm) locked with the cam A shaft (CRG) locked with the cam Shafts (CRG) locked with the cam
2.4 Disk eject operation
1. When the loading motor turns in reverse, the disk eject operation begins. 2. The ejection of a 12 cm disk is completed when the SW3 turns OFF, then ON, and then OFF again. 3. The ejection of an 8 cm disk is completed when the SW2 turns OFF, then ON, and then OFF again.
18
|
|
|
> |
|