This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
Text excerpt from page 44 (click to view)
AH-X127E AU-X127E AY-X127E AE-X127E
19. Take out the compressor cover.
23. Remove one screw which is fixing the reactor cover. And take it out.
20. Take out the thermistor from the tube.
24. Remove two screws which are fixing the reactor. And take it out.
21. Take out the thermistor from the holder. (AE-X127E only)
[Fan motor angle] 25. Remove two screws which are fixing the fan motor. And take it out.
[Reactor] 22. Disconnect the wires from the reactor to the condenser box.(4 wires)