|
Who's Online
There currently are 6043 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
El producto satisface las necesidades del servicio t
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
1
2
3
4
� Mode for checking the load on the Jog dial
A
In this mode, the load (light/heavy) on the Jog dial while it is rotated is subjectively measured.
JOG Check Mode : ON
CALL POWER SW
+
FWD+ REV
B
POWER ON
FL display
Rotation speed
Time (msec)
Measuring method
C
In this state, if you rotate the Jog dial rapidly either clockwise or counterclockwise, figures are displayed. For example, if "16.14 0135" is displayed, it means as follows: 16.14: Highest speed (given that the normal [1x] speed is when it takes 1.8 sec for the Jog dial to rotate one full turn.) 0135: Time (msec) required for the Jog dial to decrease its speed from 3x speed to 1.5x speed As to the time required for the Jog dial to decrease its speed, if the measurement is performed for several times repeatedly, from the second measurement and afterward, the average of the current required time and the previous required time is displayed. Thus, after several measurements, the result becomes closer to the mean. Notes � Perform the measurement of load on the Jog dial more than three times. � The measurement result is displayed only when the Jog dial is rotated 7 times normal speed "07.00" or more.
D
Management value
Jog management value: 150 ± 25 (msec)
Load adjustment method
Remove the screw fixing the adjust plate, then screw it into the hole corresponding to the value (-1, -2, -3, +1, or +2) for a load to be added: -1, -2, -3 : To decrease the load +1, +2 : To increase the load
E
To decrease the load
Adjust plate
-3
-2
+2
To increase the load
-1 0 +1
JOG Check Mode : CANCEL
F
POWER OFF
72
1 2
CDJ-1000MK2
3 4
|
|
|
> |
|