|
Who's Online
There currently are 5994 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
This is exactly what I needed This was a hard one to find and I had already downloaded several for other Panasonic radios but none matched my radio.
Although my radio is the LBE model the LBS is the same.
A very good quality manual with every thing you should get in it
;
el manual es correcto , completo y de buena calidad aunque algun esquema esta excesivamente diseccionado.
;
muy buen manual con multiples graficos y formas de onda ademas de muy completo y bien presentado.
;
As Always these people were very rapid and efficient. A great job helping hobbiest and workers!!! Thank you a lot!
;
Excellent printing quality.
A complete and very usefull service manual with all details.
GREAT SERVICE AT VERY LOW PRICE!
A+++++++++++++++++++++++++
1
2
3
4
- How to remove the Load Carriage Motor Assy
1. Make the system in the carriage mechanism mode, and have it clamped. 2. Release the leads (orange and purple) of Load Carriage Motor Assy from the CD Core Unit and remove the holder. 3. Remove the Poly Washer, Change Arm, and Pickup Lock Arm. 4. Remove the two Screws (A) and the Bevel Gear Bracket (Note that the gears will come off). 5. Remove the two Screws (B) and the Gear Bracket (remove the CD Core Unit, if necessary), and remove all the gears. 6. Remove the two Screws (C) and the Load Carriage Motor Assy. Caution: When assembling the Load Carriage Motor Assy, move it to the direction shown in the illustration (1). When treating the leads of the Load Carriage Motor Assy, do not make them loose over the Feed Screw.
Gear Bracket Screw B Screw A Bevel Gear Bracket Poly Washer Change Arm Pickup Lock Arm
A
B
Load Carriage Motor Assy
Screw C
C
1
D
E
F
26
CX-3164
1 2 3 4
|
|
|
> |
|