The service manual is as described and received the link to the download sooner than expected. Great service, quality product. This site is a big help in the electronics repair business.
I ordered this manual sometime in the afternoon and I received it on my e-mail the same evening.
This is a fantastically good and properly scanned copy of the original manual. All pages are of the same scale and they overlap each other. It means that you can print the manual and easily make it as a convenient paper manual.
The content of the manual is fantastic. Alignment descriptions, PCB layouts and elementary diagrams are explicit and precise. I immediately found what I was looking for. Thanks to this manual and Owner-Manuals.com my amplifier is alive again. Many thanx indded!
Text excerpt from page 62 (click to view)
1
2
3
4
6.5 MECHANISM ADJUSTMENT
A
1 Tangential and Radial Height Coarse Adjustment START
� Remove the 03 SD Pickup Assy-S from the Traverse Mecha. Assy. � Remove the joint and the joint spring of the 03 SD Pickup Assy-S.
03 SD Pickup Assy-S
B
Note: Before removing the flexible cable for the pickup, soldering of the pickup circuit is necessary. For details, see "7.1.10 DISASSEMBLY".
Joint Joint Spring
� Pass through the guide shaft to a new 03 SD Pickup Assy-S. � Attach it to the Traverse Mecha. Assy.
C
03 SD Pickup Assy-S
Guide Shaft
D
� Put the joint between the Tangential (or Radial) adjustment screw and the mechanism base and turn each screw to adjust the height. (Refer to "6.1 ADJUSTMENT ITEMS AND LOCATION".)
Joint
7.5mm Mechanism base
E
� Attach the Traverse Mecha. Assy-S to the 04 LOADER Assy. � Turn it over and attach the joint and the joint spring. � Arrange the flexible cables. (Refer to "7.1.10 DISASSEMBLY".)