|
Who's Online
There currently are 6041 guests and 2 members online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
A good manual. Had everything i needed to make the repair.
;
This manual is a complete guide, including later additions. It has all the necessary information about the replacement items. The material quality is great to read.
;
This manual is very helpful, correct shematic diagram, and good exploded view.Perfect!
;
Alte gescannte Servicepläne sind oft doch etwas undeutlich . Stromlaufpläne werden auf mehrere DIN A4 Seiten aufgeteilt. Alles ziemlich umständlich und zeitaufwendig. Aber mit etwas Mühe geht alles.
;
Great item, high resolution, detailed, very easy to work with.
� Safety Check after Servicing
Examine the area surrounding the repaired location for damage or deterioration. Observe that screws, parts and wires have been returned to original positions. Afterwards, perform the following tests and confirm the specified values in order to verify compliance with safety standards. 1. Insulation resistance test Confirm the specified insulation resistance or greater between power cord plug prongs and externally exposed parts of the set (RF terminals, antenna terminals, video and audio input and output terminals, microphone jacks, earphone jacks, etc.). See table below. 2. Dielectric strength tes Confirm specified dielectric strength or greater between power cord plug prongs and exposed accessible parts of the set (RF terminals, antenna terminals, video and audio input and output terminals, microphone jacks, earphone jacks, etc.) See table below. 3. Clearance distance When replacing primary circuit components, confirm specified clearance distance (d), (d') between soldered terminals, and between terminals and surrounding metalic parts. See table below.
Table 1: Rating for selected areas AC Line Voltage 100V 110 to 130V * 100 to 250 V Region Japan USA & Canada South America Insulation Resistance � 1 M�/500 V DC ���
Fig. 1 Dielectric Strength 1kV 1 minute 900V 1 minute Clearance Distance (d), (d') � 3 mm � 3.2mm � 6 mm (d) � 8 mm (d') (a: Power cord)
� 10 M�/500 V DC
4 kV 1 minute
Note: This table is unofficial and for reference only. Be sure to confirm the precise values for your particular country and locality. 4. Leakage current test Confirm specified or lower leakage current between B (earth ground, power cord plug prongs) and externally exposed accessible parts (RF terminals, antenna terminals, video and audio input and output terminals, microphone jacks, earphone jacks, etc.) Measuring Method: (Power ON) Insert load Z between B (earth ground, power cord plug prongs) and exposed accessible parts. Use and AC voltmeter to measure across both terminals of load Z. See figure and following table. Fig. 2 Load Z Leakage Current (i) ¡ � 1m A rms ¡ � 0.5 m A rms ¡ � 0.7 m A peak ¡ � 2 m A dc ¡ � 0.7 m A peak ¡ � 2 m A dc
Earth Ground
Table 2: Leakage current ratings for selected areas
AC Line Voltage Region
100V 110 to 130 V
Japan USA & Canada South America
100 to 130 V 200 to 250 V
(B) to: Exposed accessible parts Exposed accessible parts Antenna earth terminals Other terminals
Note: This is table unofficial and for reference only. Be sure to confirm the precise values for your particular country and locality.
|
|
|
> |
|