perfect! you just sent to me the copy in Italian witout even my specification!!!! so you are really smart cooperative and efficient. To my opinion the best place all over to get a manual of electronics!!!!
Great manual, would not have been able to operate my machine without it!!
James Dawson August 18, 2012
Text excerpt from page 3 (click to view)
7. Removal of SUB1 Board
1. Disconnect CN101 on SUB1 Board. 2. Unscrew 2 screws (G) so that the SUB 1 Board can be removed.
9. Removal of MAIN Board
1. Disconnect CN1 on MAIN Board so that the EVF cable can be removed. 2. Unscrew 4 screws (H) so that the MAIN Board can be removed. SCREWS (H)
CN101
SCREWS (G) SCREWS (H)
8. Removal of SUB2 Board
1. Unscrew hex screw fixing all front knobs. (PEAKING, CONTRAST and BRIGHT knob) 2. Unscrew hex nut (A) and then pull out the each front knob so that the SUB 2 board can be removed.
10. Removal of Guard Bar
1. Unscrew 2 screws (I) so that the Guard bar can be removed.