There are currently no product reviews.
 ;
Awesome manual. Complete diagrams of all board assemblies as well as how to get to each part of the t.v. down to the individual screws and their locations. Get it.
 ;
perfect copy, im very satisfied, i was need the diagram over the powersupply and
the copy was very sharp
 ;
This is exactly the service manual I needed.
Complete with all schematics, partslists, PCB layouts and alignment instructions.
This manual covers both the T-4970 en T-488F Onkyo tuner.
 ;
IF PRINTED CIRQUIT BOARD WIRING VIEW WAS ONE TONE LIGHTER, THEN 5 STAR RANK HAS TO BE MY CHOISE.
 ;
Very usefull, good quality drawings !
Muito útil encontrei todas as informações necessárias.
2.3 CHECKUP AND ADJUSTMENT OF MECHANISM PHASE Note: Pay careful attention to the installing order and phase of mechanism parts of the loading system.
Align the two holes of the Loading ring assembly to those of the deck.
Align the hole of the Loading gear (T) assembly to that of the deck.
Align the hole of the link lever assembly to the deck hole.
Align one of the three holes of wheel gear to the deck hole.
Align each one link lever assembly hole and deck hole to the hole at the control cam position.
Fig. 2-3-1 Top of main deck
Align this part to each �Triangle� mark.
Align this part to each �Triangle� mark.
Fig. 2-3-2 Rotary encoder 2-6
|