|
Who's Online
There currently are 5959 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
The Service Manual received was helpful. Good copy of original document.. I recomend all of my friends about this technical page.
;
Perfect, complete manual, exactly what I needed. Recommended to everyone.
;
Very usefull manual. From my point of view there are needs more clearables images.
;
Once again owner-manual.com has saved the day for me, and come through with the manual I need. I looked other places too, and couldn't find it anywhere. Thank You owner-manual.com!!! You're the BEST!
;
very good quality that can be magnified several times, and it remains readable.
For sure I will return next time the need for a service manual arise.
2.2 Replacement of the main mechanism parts 2.2.1 Cassette holder 2.2.1.1 Removal (1) Remove the screws (a) and (b). (2) Hold up the top frame, cassette holder assembly, drive arm assembly and side frames (L/R) all together and remove them by releasing the hooks (a) and (b).
Screw (a)
2.2.1.3 Disassembling (1) Release hook (a) to remove the earth spring (1) from the top frame. (2) Release the catches (a) and (b) and pull the top frame in the direction shown by the arrow (a) to remove it. (3) Pull out the side frame (R). (4) Pull out the cassette holder assembly and drive arm assembly from the side frame (L).
Hook (a)
Catch (a)
Catch (b)
Screw (b)
Hook (a) Hook (b)
EARTH SPRING(1) Arrow (a) TOP FRAME
Fig. 2-2-1a 2.2.1.2 Installation (phase adjustment) (1) Turn gear (a) of the loading motor assembly so that the main deck connects to the guide hole (a) of the drive lever. (2) Hook the main deck to hooks (a) and (b). (3) Place the projection of the drive lever to section (a) of the side frame (R) and install the cassette holder to the main deck. Make sure that the bosses of the side frame (L/R) connect with the holes (a) and (b) of the main deck. (4) Secure screws (a) and (b).
Screw (a) Screw (b)
SIDE FRAME(L) CASSETTE HOLDER Assembly DRIVE ARM Assembly
SIDE FRAME(R)
Fig. 2-2-1c 2.2.1.4 Assembling (installation and phase adjustment) (1) Turn gear (a) of the loading motor assembly so that the main (2) (3) (4) deck connects to the guide hole (a) of the drive lever. Place the projection of the drive lever on section (a) of the side frame (R) and install the side frame (R) to the main deck. Secure screw (b). Place section (b) of the drive arm on the gear of the side frame (R). Make sure that the pin of the door opener connects with section (c) of the drive arm. Place the drive arm on section (d) of the side frame (L) and install the side frame (L) on the main deck. Be sure to con-
Hook (a) Hook (b) Section (a)
(5)
Hole (b) Hole (a) Guide hole (a) DRIVE LEVER Gear (a)
nect the earth spring (1) to the side frame (L). (6) Secure screw (a). (7) Turn gear (a) of the loading motor assembly until the drive arm is vertical. (8) Place the slit of the side frame (L/R) at the foot of the cassette holder assembly and install the cassette holder. (9) Place the top frame on the position guide (a) of the side frame (L/R) and push it in the direction shown by the arrow (a) for installation. (10) Hook the earth spring (1) to the hook (a) of the top frame.
Fig. 2-2-1b 2-4
|
|
|
> |
|