|
Who's Online
There currently are 5542 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
It is great, it saves money and paper. It helps me to save room and recources.
;
manual service is ok , resolve the problems
manual service is ok , resolve the problems
manual service is ok , resolve the problems
manual service is ok , resolve the problems
manual service is ok , resolve the problems
;
Well I got all the necessary specifications for the job. Document of good quality and good definition of the diagrams
;
hi .full information for JVC GRVF1EG Service Manual its compete .Thank You
;
perfect and good copies, all good readable.
within 24hrs and very cheap also.
NW-E55/E75/E90/E95 SECTION 2 TEST MODE
STANDING PROCEDURE
Procedure 1: Set a dry battery into NW-E50/E70, and keep the battery lid open. Procedure 2: In HOLD state, while pushing Nx and [GROUP] button, turn power on by closing the battery lid of NW-E50/E70. Procedure 3: Set HOLD state off. After starting up test mode, the following contents can be checked.
TEST MODE
� Nx button The KEY test mode is activated. All key inputs are completed, then Nx button is pressed, restart. (Be aware that the initialization is included on all key input.) � [MENU] button EL0 (blue) lights on/off. � [GROUP] button EL1 (green) lights on/off. � -/> All LCD lights and ACCESS LED lights off. � ./+ All LCD lights and ACCESS LED lights on. � [VOL +] button BEEP turns on. � [VOL --] button BEEP turns off. � [ � REPEAT SOUND] button Initialized. (Turns to the factory preset state, time, volume setting and so on.) The music data, files and so on in the memory are not changed.
5
|
|
|
> |
|