There are currently no product reviews.
;
Good quality, the manual help me to repair the echo/reverb section
;
A good service manual with lots of info and a very fair price
;
Great value, good scan, just as expected, everything that you need.
;
Good scan, great price, but almost the same with the SV260 service manual.
;
This PDF is very comprehensive. It includes drawings, parts lists, schematics, pictures, PCB drawings, mechanical layouts, etc. for all three stackable equipment. The scans are good too. Easy to read and no smudges or black lines. I have no complaints. I will make this site my first stop for finding my service manuals.
1
2
3
4
8.5 MECHANISM ADJUSTMENT
A
1 Tangential and Radial Height Coarse Adjustment START
� Remove the 05SD Pickup Assy from the Traverse Mechanism Assy-S. � Remove the joint and the joint spring of the 05SD Pickup Assy.
05SD Pickup Assy
B
Note: Before removing the flexible cable for the pickup, soldering of the pickup circuit is necessary. For details, see "7. DISASSEMBLY".
Joint Joint Spring
� Pass through the guide shaft to a new 05SD Pickup Assy. � Attach it to the Traverse Mechanism Assy-S.
C
05SD Pickup Assy
Guide Shaft
D
� Put the joint between the Tangential (or Radial) adjustment screw and the mechanism base and turn each screw to adjust the height. (Refer to "8.1 ADJUSTMENT ITEMS AND LOCATION".)
Joint
7.5mm Mechanism base
E
� Attach the Traverse Mechanism Assy-S to the 05 LOADER Assy. � Turn it over and attach the joint and the joint spring. � Arrange the flexible cables. (Refer to "7. DISASSEMBLY".)
F
40
1 2
PD-D9-J
3 4
|