|
Who's Online
There currently are 6043 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Great quality complete service manual! complete parts list and drawings. Thanks!
;
Very good quality, prompt response. This website has reasonable prices and wide range of manuals that are hard to find.
;
The document was usefull, and it was exactly what I was looking for.
;
OK?..manual is complet and helpfull... for repairing such a old and rare boombox like JVC PCM it is necessary...
;
Super Anleitung. Ordentliche Auflösung. Das ganze noch in Deutsch wäre zu schön. Alle Datenblätter sind sauber Kopiert und alle Leitungswege sind sauber ausgeführt
2-13. TRAY (SUB)
1 Turn the pulley (LD) and move the slider (selection) in the direction of the arrow L. 2 Turn the pulley (mode) in the direction of the arrow to adjust the tray (sub) that you want to remove. (It depends on the height and position of the stocker.) 3 Turn the pulley (LD) and move the slider (selection) in the direction of the arrow R. 4 Turn the pulley (mode) in the direction of the arrow so that you can remove the tray (sub) that you want to remove.
Pully (LD)
Slider (selection)
Stocker section
L R
Pully (mode)
Tray (sub)
2-14. CHASSIS (MOLD B), STOCKER, SLIDER (SELECTION)
Note: When assembling the parts, refer to pages 13 and 14.
7 Two screws (PTPWH M2.6) 6 Stocker section 8 Slider (selection) 9 Washer
0 Compression spring
Pully (LD)
1 Three screws (BVTP M2.6)
5 Two step screws
2 Chassis (mold B) section
Note: Rotating the pully (LD), shift the slider (selection) to the left.
4 Two step screws
3 Gear (eject)
12
|
|
|
> |
|