I am satisfied with the service. And if need another manual, i will definitely buy from this site. Keep up the good work.
Text excerpt from page 67 (click to view)
Tray (3)
� Confirm that the mark of the gear matches with the triangle mark on the reverse side of the tray in the tray close status. (The gear is rotated with the slider locks.) (Refer to Fig. B.)
B
Gear (4)
Fig. A Triangle mark
Tray panel (4)
A
Claws Tray (3)
Tray panel (4)
Position of the line Pickup mechanism assembly Gear (4)
Tray rack gear
Fig. 2-1-5 1-1-4. Front Panel and Tray 1. Remove the flexible cable (1). 2. Remove one screw (2) and remove the GND lead (5). 3. Release four claws and remove the front panel (4). 4. Pull out the tray (3) to this side.
Screw (2) GND lead (5)
Fig. B Tray (3) Gear Marking Triangle mark
Slider
Claw
Fig. 2-1-7 1-1-5. Rear Panel 1. Remove three screws (1) and remove the rear panel (2).
Rear panel (2)
Tray (3) Claws Front panel (4) Flexible cable (1) Claw
Screws (1)
Fig. 2-1-6 Note: � Insert the tray (3) with the front side of the pickup mechanism assembly descended. (The slider positions to the left side.) � The gears are required to match their phases each other. After setting the gear (4) as shown in the figure �A�, insert the tray (3). When inserting a tray (3), push the rack gear side shown by the arrow.