|
Who's Online
There currently are 6043 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Excellent printing quality.
A complete and very usefull service manual with all details.
GREAT SERVICE AT VERY LOW PRICE!
A+++++++++++++++++++++++++
;
Excellent printing quality.
A complete and very usefull service manual with all details.
GREAT SERVICE AT VERY LOW PRICE!
A+++++++++++++++++++++++++
;
Very fast and perfect delivery. Clear and well scanned. A lot of work professionally realized.
Again thak you a lot
;
This manual is accurate and of high quality. It is only volume 2 of the service manual. This is schematic, parts lists, and exploded mechanical drawings. The theory of operation and the diss-assembly instructions are in volume 1. The unit can be tricky to dis-assemble portions of so the volume 1 manual can be important. The product description of the manual is accurate but it does not say anything about volume 1 and the image of the front page does clearly say Volume 2.
;
Wellll again thank you very much fast and effective. Clear and well done for such an old TV!!!!
SJ-58LM-T2 SJ-63LM-T2 SJ-68LM-T2
(4) As a reference to determine the causes of trouble, malfunction and phenomena are described below. Refer to the following when repairing. 1. Disconnection of defrost heater As off-cycle defrosting is performed, the defrosting time is extremely prolonged. Each time defrosting is started, the freezer temperature rises and a portion of ice and stored foods are melted. 2. Melted thermo. fuse or opened-circuit due to the defect of defrost thermostat. When the above mentioned trouble occurs in cooling operation, the timer motor does not run, defrosting will not take place, and consequently freezing is caused. In the above mentioned condition, when the timer shaft is turned by hand to defrost, the timer motor runs during the operation time. However, the motor stops from the time when the contact is changed, and freezing causes. NOTE: As the thermo. fuse assembly is intended to prevent dangers, do not use it under shorted condition even for a short period. 3. DEW PREVENTION The hot pipe, namely D.P.-condenser, is arranged around the flange part of cabinet and the C-partition plate, preventing dew from being generated on the cabinet. NOTE: D.P.-condenser pipe may be felt hot if touched by hand while the compressor is in operation. If you are asked about this, please explain that the hot pipe serve to prevent the dew generation.
Hot pipe
Figure F-7 4. INSPECTION OF INITIAL STARTING (1) Inspection of cooling unit 1. Set the temperature control knob to "MAX" and check that the compressor starts to operate. 2. Depress the door switch to run the fan and check that cool air is blown out of the cold air outlet of the freezer and the refrigerator. 3. When the compressor does not work, check that the timer is not set to "defrost" position. 4 It takes about an hour and a half or two hours to put food in the refrigerator after starting operation. NOTE: After return the temperature control knob to "MED" position. When the refrigerator is operated initially after installed, the compressor may vibrate excessively for 1 to 2 min. However, vibration becomes normal if it is continuously operated. (2) Inspection of defrost device Operate the refrigerator for 20 to 30 min. and then check the defrost device in the following procedures : Allow 5 min. to restart the compressor since immediate starting after stopping will cause unsmooth operation. 1. Turn the timer shaft clockwise with a screw driver. At this time, make certains the timer clinks and the compressor stops. 2. After more than 5 min., turn the shaft further to operate. Make certain cooling operation is started again.
12
|
|
|
> |
|