|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Excellent quality, very quick download turnaround, will definately use again.
 ;
This is a awesome quality scan of the original Service Manual for Technics 8099.
Contains the circuit diagram, PCB layout, adjust/tune instructions as well.
Since this is my first buy here, i'm really glad! This site do works as intended/described, it's definitely not scam!
Мои рекомендации! Все мануалы настоящие!
 ;
Good Quality of the File.
You get the normal manual is incudet.
 ;
Very nice and real Service Manual, I didn't thought it actually exist in the real world at all.
 ;
VERY NICE FOR COURTESY AND PRECISION!.
tHE SITE IS VERY IMPORTANT FOR ALL DEVICES
vERY GOOD
Precautions
1-4 Handling the optical pick-up
The laser diode in the optical pick up may suffer electrostatic breakdown because of potential static electricity from clothing and your body. The following method is recommended. (1) Place a conductive sheet on the work bench (The black sheet used for wrapping repair parts.) (2) Place the set on the conductive sheet so that the chassis is grounded to the sheet. (3) Place your hands on the conductive sheet(This gives them the same ground as the sheet.) (4) Remove the optical pick up block (5) Perform work on top of the conductive sheet. Be careful not to let your clothes or any other static sources to touch the unit. � Be sure to put on a wrist strap grounded to the sheet. � Be sure to lay a conductive sheet made of copper etc. Which is grounded to the table.
THE UNIT 1M WRIST-STRAP FOR GROUNDING
1M
CONDUCTIVE SHEET
Fig.1-3
(6) Short the short terminal on the PCB, which is inside the Pick-Up ASS�Y, before replacing the PickUp. (The short terminal is shorted when the PickUp Ass�y is being lifted or moved.) (7) After replacing the Pick-up, open the short terminal on the PCB.
Samsung Electronics
1-5
|
|
 |
> |
|