|
Who's Online
There currently are 5054 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
I PURHASED THIS PRODUCT BECAUSE I WAS HAVING PROBLEMS WITH MY CDR20 HARMAN KARDON RECORDER. WHICH I PURCHASED NEW 12 YEARS AGO. AFTER REVIEWING THE MANUAL, I WAS ABLE TO ADJUST THE TENSIONER IN THE SYSTEM. WORKS LIKE A CHAMP!.
SAVED ME AT LEAST 100.00 WHICH WAS WHAT A SERVICE REPAIR STATION WANTED. GREAT MANUAL EASY TO READ. SPECIALLY AFTER I PRINTED THE PAGES WHICH DEALT WITH MY RECORDER. THANKS A LOT!!!!!!!!
;
You can fully trust on this one!
All the schematics are very crear an in one piece per page
;
I have never bought a service manual which is as competely readable as this althogh it was a scanned pdf. Thank you for this succesful manual also cheaper than other sites.
;
Thanks for a very good and readable servicemanual. Just what I needed as a "dinosaur technician". I really recommmend this site and will come back.
Åsbjörn
;
The manual I purchased was just what I needed. I was glad to find a site where I can find so many manuals on a wide variety of products.
VL-ME10S/H/E
<REW back tension standard> (If the tension fluctuates, read its center value.) 15 ± 12mN
6-8. Checking of winding Tu reel base ratchet torque
DC3V, without cassette controller assembly (Independent Mechanism) (1) Remove the cassette controller assembly, then apply DC3V to the loading motor and put the system into standby mode. (refer to 8-1) (2) Move the swing arm toward the S reel base side. Be careful not to cause damage to the gears and other parts in the process. (Fig. 8) (3) Set a back tension measurement reel hub on the Tu reel base. (4) Using a dial tension gauge, pull the string in the A direction, then confirm that the tension is within the standard. <Winding Tu reel base ratchet torque standard > (If the tension fluctuates, read its center value.) 100mN or less
Move the swing arm toward the S reel base side.
A
6-9. Checking of rewinding playback (VS-REW) back tension
DC3V, without cassette controller assembly (Independent Mechanism) (1) Remove the cassette controller assembly, then apply DC3V to the loading motor and put the system into rewinding playback (VS-REW) mode. (refer to 8-1) (2) Move the swing arm toward the S reel base side. Be careful not to cause damage to the gears and other parts in the process. (3) Set a torque gauge on the Tu reel base. (4) Turning the torque gauge to counterclockwise (1 turn for 3 seconds), then confirm that the torque is within the standard. <Rewinding playback (VS-REW) back tension standard value> (If the tension fluctuates, read its center value.) 0.70 +0.6/-0.3mN·m
Fig. 7. Loading back tension measurement method
6-10.Checking of pinch pressing force
DC3V, without cassette controller assembly (Independent Mechanism) (1) Set the pinch roller pressing force measuring thread on the pinch lever (position A , Fig. 9). (2) Set the mechanism to the playback mode, press the pinch roller against the capstan axis. (3) Fit the tension gauge to the pinch roller pressing force measuring thread, pull in the arrow B direction shown in Fig. 11 to separate a little the pinch roller from the capstan axis. (4) Gradually return the pinch roller, and when the pinch roller contacts parallel the capstan axis, read the value (see Fig. 10) to make sure that the value conforms to the standard shown below. <Standard> 1.8 +0.3/-0.5N <Caution> After making this measurement, quickly release the system from playback mode and remove the pinch roller from the capstan shaft. (If the pinch roller is left fitted onto the capstan shaft for a long time, the pinch roller will be deformed.)
Move the swing arm toward the S reel base side.
A
Fig. 8. Winding Tu reel base ratchet torque measurement method
Pinch roller
Capstan shaft
Right guide
A
B
OK NG
Fig. 9
Fig. 10
Fig. 11
10
|
|
|
> |
|